TitleProduct

Jewelry Retail Store Display Showcases Kiosks

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-23 00:25

  • Browse the number:

    31

Send an inquiries

Company Profile

Dongguan Besty Display Co., Ltd.

By certification [File Integrity]

Contact:Ms. Merry Han(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website: http://displayshowcase.wtsaihua.com/

Product Details

BESTY JEWELRY/WATCH STORE DESIGN
Customer's store in Australia,UK,USA,Canada,UAE



Project Process:

1.The measurement on site(1-2days by client)
Every shopping mall or store is in accordance with the division of the field, according to the different use, brand, function,hope to get the good effect of display design, etc.

2.The selection of design idea/Concept (2-3days by manufacturer)
According to the standards of the brand(VI), or unique showcase requirements, tell us about your product and your idea -we'll work together to help you develop the design.

3.The integrated solution (2-3days by manufacturer)
According to your special demands and total budget, recommended integration solutions,which includes design, products,logistics, on-site installation etc.

4.Plan Drawing / Interiors Design/ 3D Prototype(3-5days by manufacturer)
We can work from a sketch, picture, or CAD drawing. We'll create a 3D prototype to ensure the materials and design meetall of your requirements.

5.The budget and price calculation(2-3days by manufacturer)
Overall design and selection of product materials is the key cost of the price, of course,there also need consider for integratedshipping logistics and installation costs.

6.The production in workshop (18-25days by manufacturer)
Preparation for materials(2-3days)-->Wood working and structure assemble(7-12days)-->Sanding and polishing(2-3days) -->Undercoating and polishing(1-2days)-->Top finishing(2-3days) -->Final assembly with glass, metal, light and other elements(2-3days)-->Packing(1-2days)

7.The shipment and to your project site (the time depend on your country)
We can make your life as easy as pie with our professional project management, shipping,logistics, and fulfillment services.